Road Resurfacing at Ballance

Excavat was contracted to recontour and resurface a section of road at Ballance. The existing road had deteriorated significantly, with numerous potholes causing safety concerns and disrupting daily operations.

The main challenge was the poor condition of the road, which made a simple patch-up insufficient. Instead, a full recontouring process was necessary to create a stable foundation before resurfacing. Additionally, the work needed to be carried out efficiently to minimise disruption to factory operations. We undertook a full road recontour, carefully shaping the surface to improve drainage and stability. High-quality aggregate was used, along with advanced compaction techniques, to ensure a durable and long-lasting finish. Throughout the process, careful project management allowed the factory to maintain essential operations with minimal interference.

The result was a smooth, durable road surface that significantly improved safety and accessibility for Ballance. For expert excavation and resurfacing solutions, contact us for a site visit today!

Related Projects

St Joseph’s School Hawera

Year Complete — 2025Location — Hāwera, TaranakiHead Contractor — Clelands Construction Excavat was engaged by head contractor Clelands Construction to carry out all earthworks and civil preparation for the redevelopment of St Joseph’s School Hāwera — a project that delivered 10 new classrooms and a 2,300m² outdoor learning and play

Read More +
Foundation Preparation Project Hoiho Fonterra

Project Hoiho at Fonterra

Project Overview Fonterra’s Project Hoiho at the Whareroa site was a major undertaking focused on constructing Energy Centre 6 (EC6), a new facility housing the country’s largest heat pumps as part of a comprehensive ammonia processing plant upgrade. Excavat was contracted by Apollo Projects to deliver foundation and civil construction

Read More +

Eltham Kiwifruit Orchard

The Challenge The client needed to establish a new kiwifruit orchard on undeveloped land that presented several challenges: Our Solution Water Infrastructure & Access We relocated the existing water mains to run alongside the gravel driveway, installing a new 20mm water pipe ensure reliable water supply. The existing driveway was

Read More +

Forestry Track and Culvert Replacement

A major forestry operation experienced significant damage to a critical access road culvert due to a washout, requiring emergency replacement and track restoration. The existing log culvert structure had failed, creating a hazardous crossing point that prevented safe vehicle access to forest management areas. The damage had compromised both operational

Read More +

Ready to break ground on your project?