Todd Energy faced a challenge with their Palmer Road site entrance, requiring an upgrade capable of withstanding regular heavy truck traffic. We provided their solution through civil siteworks, transforming the entry from chipseal to engineered concrete to meet their specific needs.
Our team planned and executed the upgrade, ensuring durability and functionality for heavy vehicle use. The transition to engineered concrete not only enhances the entrance’s strength but also improves safety and efficiency for ongoing operations.