Effluent System Upgrade

Earthworks, Sand Trap Installation, Pipework/Connection Installation

Effluent System Upgrade

Our client faced a pressing issue on their dairy farm: their current effluent system was not sufficiently sized to meet their growing needs. To address this we installed an extensive solution, upgrading the entire effluent system to ensure optimal functionality and capacity.

The first step of our solution involved extending the existing pond to a massive 7 million litre capacity, significantly increasing the system’s storage capability. Additionally, we installed a new custom sand trap measuring 20m long by 3m wide. To complete the upgrade, we supplied and installed all new pipework and connections, ensuring the system functioned seamlessly.

Scroll to Top