Normanby Dairy Farm Upgrades

Our client needed several infrastructure upgrades across their dairy farm to enhance efficiency and operations. This included addressing their effluent management, improving accessibility and clean out of their calf rearing sheds.

We upgraded their effluent system, including enlarging the pond, setting up a new custom sand trap, and installing and connecting new pipework. We also improved the farm tracks for better accessibility and cleaned out the calf shed ready for the next season.

Related Projects

St Joseph’s School Hawera

Year Complete — 2025Location — Hāwera, TaranakiHead Contractor — Clelands Construction Excavat was engaged by head contractor Clelands Construction to carry out all earthworks and civil preparation for the redevelopment of St Joseph’s School Hāwera — a project that delivered 10 new classrooms and a 2,300m² outdoor learning and play

Read More +
Foundation Preparation Project Hoiho Fonterra

Project Hoiho at Fonterra

Project Overview Fonterra’s Project Hoiho at the Whareroa site was a major undertaking focused on constructing Energy Centre 6 (EC6), a new facility housing the country’s largest heat pumps as part of a comprehensive ammonia processing plant upgrade. Excavat was contracted by Apollo Projects to deliver foundation and civil construction

Read More +

Eltham Kiwifruit Orchard

The Challenge The client needed to establish a new kiwifruit orchard on undeveloped land that presented several challenges: Our Solution Water Infrastructure & Access We relocated the existing water mains to run alongside the gravel driveway, installing a new 20mm water pipe ensure reliable water supply. The existing driveway was

Read More +

Forestry Track and Culvert Replacement

A major forestry operation experienced significant damage to a critical access road culvert due to a washout, requiring emergency replacement and track restoration. The existing log culvert structure had failed, creating a hazardous crossing point that prevented safe vehicle access to forest management areas. The damage had compromised both operational

Read More +