Commercial Floor Pad 

Our client needed a large, stable floor pad for their new 2700sqm commercial building. The site required precise preparation to ensure the foundation could support the extensive new structure.

We tackled this by constructing the entire building pad. We began by digging the necessary footings to provide a solid base for the structure. Our team then carefully flattened the main pad ensuring a perfectly level surface. Then we performed a precise final trim to achieve the exact specifications required for the building pad. In addition we prepared the surrounding landscaping, integrating it seamlessly with the plans for the site.

Related Projects

St Joseph’s School Hawera

Year Complete — 2025Location — Hāwera, TaranakiHead Contractor — Clelands Construction Excavat was engaged by head contractor Clelands Construction to carry out all earthworks and civil preparation for the redevelopment of St Joseph’s School Hāwera — a project that delivered 10 new classrooms and a 2,300m² outdoor learning and play

Read More +
Foundation Preparation Project Hoiho Fonterra

Project Hoiho at Fonterra

Project Overview Fonterra’s Project Hoiho at the Whareroa site was a major undertaking focused on constructing Energy Centre 6 (EC6), a new facility housing the country’s largest heat pumps as part of a comprehensive ammonia processing plant upgrade. Excavat was contracted by Apollo Projects to deliver foundation and civil construction

Read More +

Eltham Kiwifruit Orchard

The Challenge The client needed to establish a new kiwifruit orchard on undeveloped land that presented several challenges: Our Solution Water Infrastructure & Access We relocated the existing water mains to run alongside the gravel driveway, installing a new 20mm water pipe ensure reliable water supply. The existing driveway was

Read More +

Forestry Track and Culvert Replacement

A major forestry operation experienced significant damage to a critical access road culvert due to a washout, requiring emergency replacement and track restoration. The existing log culvert structure had failed, creating a hazardous crossing point that prevented safe vehicle access to forest management areas. The damage had compromised both operational

Read More +